Project Case Studies Operational Flexibility

Operational flexibility yields significant follow-on contract

Challenge:

Two of S3's work class ROVs (both Triton XLS vehicles) were deployed on a light construction ROV vessel to support subsea production tree installation operations.  The vessel was working in close liason with a semi-submersible drilling rig in deep water.  When the rig ROV got into difficulty, the S3 ROV teams were asked to support the rig operations.

Solution:

The ROV tooling systems on the drilling rig were passed down to the support vessel for review and application on the S3 ROVs.  After review of the requirements and the equipment available, the S3 personnel were able to install the systems and operate them in conjunction with the rig drilling team.

This solution saved the end-Client significant costs and lead to a significant follow on contract direct with the end-Client/Operator.