About Us Previous Projects

S³ Previous Projects

All of S³’s experienced management team have extensive knowledge and proven track-records of the environment within which they operate.

The team has been previously involved in the management of large deep water high tech projects such as:

  • The 'Prestige' oil recovery project in 4000m of water offshore Spain.
  • The 'Ormen Lange' subsea route preparation and installation project in 1000m offshore Norway.
  • 175km pre-lay cable route survey and crossing and preparation works on “Alpha Ventus Windfarm” North Sea, 2008.
  • ROV installation of 700 concrete mats and hundreds of grout bags on a pipeline and production well head protection programme in the Mediterranean, 2008.
  • Twin production tree installation including jumper leads and anti-trawl protection commissioning in 750metres of water in the Mediterranean, 2009.
  • Positioning and survey support for installation of cable and seismic nodes in 2500m water depth in the eastern Mediterranean.

This is a small selection of recent projects and Track Record that the team has been involved in which exemplifies the depth of experience in the Company and is given to demonstrate the diversity of expertise.

As part of our FPAL membership we require Supplier Performance Feedback forms to be completed by our Clients once a job has been completed.  This form is then uploaded onto our FPAL account which in turn builds up our online track record.  It’s a quick process where both parties come together and talk through the element list to agree on a score for each of these elements.